Citation: | WANG Yan, XIONG Zuqiang, ZHAO Gaobo. Three-dimensional stress evolution and comprehensive treatment technology for super-long working face across abandoned roadway with large section[J]. COAL GEOLOGY & EXPLORATION, 2020, 48(1): 160-167. DOI: 10.3969/j.issn.1001-1986.2020.01.021 |
[1] |
尹超宇,冯光明,高鹏,等. 工作面过空巷围岩失稳机理研究[J]. 采矿与安全工程学报,2018,35(3):457-464.
YIN Chaoyu,FENG Guangming,GAO Peng,et al. Research on instability mechanism of surrounding rock in stage of working face passing abandoned roadway[J]. Journal of Mining & Safety Engineering,2018,35(3):457-464.
|
[2] |
王家臣,王蕾,郭尧. 基于顶板与煤壁控制的支架阻力的确定[J]. 煤炭学报,2014,39(8):1619-1624.
WANG Jiachen,WANG Lei,GUO Yao. Determining the support capacity based on roof and coal wall control[J]. Journal of China Coal Society,2014,39(8):1619-1624.
|
[3] |
王家臣,杨胜利,杨宝贵,等. 深井超长工作面基本顶分区破断模型与支架阻力分布特征[J]. 煤炭学报,2019,44(1):54-63.
WANG Jiachen,YANG Shengli,YANG Baogui,et al.Roof sub-regional fracturing and support resistance distribution in deep longwall face with ultra-large length[J]. Journal of China Coal Society,2019,44(1):54-63.
|
[4] |
JU Jinfeng,XU Jialin,ZHU Weibing. Longwall chock sudden closure incident below coal pillar of adjacent upper mined coal seam under shallow cover in the Shendong coalfield[J]. International Journal of Rock Mechanics and Mining Sciences,2015,77:192-201.
|
[5] |
柏建彪,侯朝炯. 空巷顶板稳定性原理及支护技术研究[J]. 煤炭学报,2005,30(1):8-11.
BAI Jianbiao,HOU Chaojiong. Research on principle of roof stability of abandoned workings and supporting technology[J]. Journal of China Coal Society,2005,30(1):8-11.
|
[6] |
谢生荣,李世俊,魏臻,等. 综放工作面过空巷时支架-围岩稳定性控制[J]. 煤炭学报,2015,40(3):502-508.
XIE Shengrong,LI Shijun,WEI Zhen,et al. Stability control of support-surrounding rock system during fully mechanized caving face crossing abandoned roadway period[J]. Journal of China Coal Society,2015,40(3):502-508.
|
[7] |
杨荣明,吴士良. 神东矿区大采高综采工作面过空巷顶板结构和支护方式研究[J]. 煤炭工程,2013,45(4):55-58.
YANG Rongming,WU Shiliang. Study on roof structure and support mode of goaf roadway in large mining height fully mechanized mining face in Shendong mining area[J]. Coal Mine Engineering,2013,45(4):55-58.
|
[8] |
李迎富,华心祝,蔡瑞春. 沿空留巷关键块的稳定性力学分析及工程应用[J]. 采矿与安全工程学报,2012,29(3):357-364.
LI Yingfu,HUA Xinzhu,CAI Ruichun. Mechanics analysis on the stability of key block in the gob-side entry retaining and engineering application[J]. Journal of Mining & Safety Engineering,2012,29(3):357-364.
|
[9] |
刘畅,弓培林,王开,等. 复采工作面过空巷顶板稳定性[J]. 煤炭学报,2015,40(2):314-322.
LIU Chang,GONG Peilin,WANG Kai,et al. Roof stability for repeated mining workface passing through abandoned parallel gateway[J]. Journal of China Coal Society,2015,40(2):314-322.
|
[10] |
王开,弓培林,张小强,等. 复采工作面过冒顶区顶板断裂特征及控制研究[J]. 岩石力学与工程学报,2016,35(10):2080-2088.
WANG Kai,GONG Peilin,ZHANG Xiaoqiang,et al. Characteristics and control of roof fracture in caving zone for residual coal mining face[J]. Chinese Journal of Rock Mechanics and Engineering,2016,35(10):2080-2088.
|
[11] |
王红胜,张东升,李树刚,等. 基于基本顶关键岩块B断裂线位置的窄煤柱合理宽度的确定[J]. 采矿与安全工程学报,2014,31(1):10-16.
WANG Hongsheng,ZHANG Dongsheng,LI Shugang,et al. Rational width of narrow coal pillar based on the fracture line location of key rock B in main roof[J]. Journal of Mining & Safety Engineering,2014,31(1):10-16.
|
[12] |
刘畅,刘正和,张俊文,等. 工作面长度的空间效应对大采高采场矿压特征的影响[J]. 岩土力学,2018,39(2):691-698.
LIU Chang,LIU Zhenghe,ZHANG Junwen,et al. Effect of mining face length on spatial structure of fracture overlying strata and underground pressure characteristics in large mining height face[J]. Rock and Soil Mechanics,2018,39(2):691-698.
|
[13] |
BARCZAK T M,TADOLINI S C. Pumpable roof supports:An evolution in longwall roof support technology[C]//SME Annual Meeting and Exhibit 2008:"New Horizons-New Challenges". Society for Mining,Metallurgy and Exploration,February 24-28,2008:208-220.
|
[14] |
徐青云,宁掌玄,朱润生,等. 综放工作面充填过空巷顶板失稳机理及控顶研究[J]. 采矿与安全工程学报,2019,36(3):505-512.
XU Qingyun,NING Zhangxuan,ZHU Runsheng,et al. Study on instability mechanism and top control of overfilled roof in fully mechanized caving face[J]. Journal of Mining & Safety Engineering,2019,36(3):505-512.
|
[15] |
李金华,段东,岳鹏举,等. 坚硬顶板强制放顶断裂力学模型研究[J]. 煤田地质与勘探,2018,46(6):128-132.
LI Jinhua,DUAN Dong,YUE Pengju,et al. Study on the fracture mechanics model of forced caving of hard roof[J]. Coal Geology & Exploration,2018,46(6):128-132.
|
[16] |
ZHANG Yaohui,WANG Yuli,LI Tianbin,et al. Effects of lithium carbonate on performances of sulphoaluminate cement-based dual liquid high water material and its mechanisms[J]. Construction and Building Materials,2018,161:374-380.
|
[17] |
闵飞虎,向必伟,刘辉,等. 采动影响下逆断层活化规律的数值模拟[J]. 煤田地质与勘探,2019,47(4):144-152.
MIN Feihu,XIANG Biwei,LIU Hui,et al. Numerical simulation on mechanism of thrust fault reactivation during mining[J]. Coal Geology & Exploration,2019,47(4):144-152.
|
[18] |
熊祖强,范传河,袁印. 空巷似膏体材料充填技术研究[J]. 煤炭科学技术,2015,43(5):13-16.
XIONG Zuqiang,FAN Chuanhe,YUAN Yin. Study on backfill technology with paste-like material in mine abandoned roadway[J]. Coal Science and Technology,2015,43(5):13-16.
|
1. |
刘剑. 高效回收遗留煤柱过空巷群泵送支柱支护技术研究. 煤炭工程. 2022(02): 43-48 .
![]() |