THE COMPLETION AND STIMULATION OF CBM WELL WITH RESPECT OF FRACTURING OF XS-02 WELL
-
-
Abstract
Based on the summary of completion and fracturing of XS-02 well,three completion patterns amd the adaptability of three fracturing fluids for CBM well are analyzed.Combining with the concrete situation of fracturing operation of XS-02 well,the causes for high fluid loss and high operation pressure during fracturing of CBM well are explained,providing the reference for the well construction in the future.
-
-