Chen Chaoyang, Li Dean, Jiang Feng, Wang Qinglong, Gao Jianzhong. THE PREDICTION MODEL OF GROUND WATER INRUSH FROM FLOOR IN JIAOZUO COAL MINE[J]. COAL GEOLOGY & EXPLORATION, 1996, 24(5): 36-39.
Citation: Chen Chaoyang, Li Dean, Jiang Feng, Wang Qinglong, Gao Jianzhong. THE PREDICTION MODEL OF GROUND WATER INRUSH FROM FLOOR IN JIAOZUO COAL MINE[J]. COAL GEOLOGY & EXPLORATION, 1996, 24(5): 36-39.

THE PREDICTION MODEL OF GROUND WATER INRUSH FROM FLOOR IN JIAOZUO COAL MINE

  • Selecting some geological factors as independant variables, which impact on the inrush of ground water , such as structure, mine stress, fracture, fault displacement, distance between fault and inrush point, thickness of water-proof layer and ground water pressure, the data at inrush points and uninrush zone as bases, introducing the theory of quantification I and II, quantifying the qualitative variables, implementing the calculation, the authors constructed the prediction model of inrush of ground water from floor in Jiaozuo Coal Mine . After practical forecast tests, the model is proved to be reliable and useful for the prediction of water outburst.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return