Citation: | ZHANG Yin, ZHAO Yi, LI Hao. Mechanism and control of strong ground pressure in fully mechanized mining face[J]. COAL GEOLOGY & EXPLORATION, 2021, 49(2): 110-116. DOI: 10.3969/j.issn.1001-1986.2021.02.014 |
[1] |
高瑞,于斌,孟祥斌. 工作面过煤柱强矿压显现机理及地面压裂控制研究[J]. 采矿与安全工程学报,2018,35(2):324-331.
GAO Rui,YU Bin,MENG Xiangbin. Study on the mechanism of strong strata behavior influenced by overlying coal pillar and control technology of ground fracturing[J]. Journal of Mining and Safety Engineering,2018,35(2):324-331.
|
[2] |
刘金海,姜福兴,朱斯陶. 长壁采场动、静支承压力演化规律及应用研究[J]. 岩石力学与工程学报,2015,34(9):1815-1827.
LIU Jinhai,JIANG Fuxing,ZHU Sitao. Study of dynamic and static abutment pressure around longwall face and its application[J]. Chinese Journal of Rock Mechanics and Engineering,2015,34(9):1815-1827.
|
[3] |
李铁,张山林,李守峰,等. 华亭煤矿强矿压力学机制与防治对策[J]. 煤炭学报,2016,41(5):1093-1098.
LI Tie,ZHANG Shanlin,LI Shoufeng,et al. Mechanism and control measures of rockburst in Huating Coal Mine[J]. Journal of China Coal Society,2016,41(5):1093-1098.
|
[4] |
肖治民,刘军,王贺,等. 动载诱发巷道底板冲击失稳机制及防控技术[J]. 地下空间与工程学报,2019,15(5):1573-1581.
XIAO Zhimin,LIU Jun,WANG He,et al. Study on mechanism and control of rock burst instability of roadway floor induced by dynamic load disturbance[J]. Chinese Journal of Underground Space and Engineering,2019,15(5):1573-1581.
|
[5] |
杨敬轩,刘长友,于斌,等. 工作面端头三角区沿空巷道强矿压显现与应力转移分析[J]. 采矿与安全工程学报,2016,33(1):88-95.
YANG Jingxuan,LIU Changyou,YU Bin,et al. An analysis on strong strata behaviors and stress transfer of the roadway approaching gob in triangle area of the face end[J]. Journal of Mining and Safety Engineering,2016,33(1):88-95.
|
[6] |
张基伟. 王家山矿急倾斜煤层长壁开采覆岩破断机制及强矿压控制方法[J]. 岩石力学与工程学报,2018,37(7):1776.
ZHANG Jiwei. The fracture mechanism of main roof stratum and strong mine pressure control method in long wall mining of steeply inclined coal seam in Wangjiashan colliery[J]. Chinese Journal of Rock Mechanics and Engineering,2018,37(7):1776.
|
[7] |
于斌,高瑞,孟祥斌,等. 大空间远近场结构失稳矿压作用与控制技术[J]. 岩石力学与工程学报,2018,37(5):1134-1145.
YU Bin,GAO Rui,MENG Xiangbin,et al. Near-far strata structure instability and associate strata behaviors in large space and corresponding control technology[J]. Chinese Journal of Rock Mechanics and Engineering,2018,37(5):1134-1145.
|
[8] |
窦林名,姜耀东,曹安业,等. 煤矿冲击矿压动静载的"应力场-震动波场"监测预警技术[J]. 岩石力学与工程学报,2017,36(4):803-811.
DOU Linming,JIANG Yaodong,CAO Anye,et al. Monitoring and pre-warning of rockburst hazard with technology of stress field and wave field in underground coalmines[J]. Chinese Journal of Rock Mechanics and Engineering,2017,36(4):803-811.
|
[9] |
窦林名,何江,曹安业,等. 煤矿冲击矿压动静载叠加原理及其防治[J]. 煤炭学报,2015,40(7):1469-1476.
DOU Linming,HE Jiang,CAO Anye,et al. Rock burst prevention methods based on theory of dynamic and static combined load induced in coal mine[J]. Journal of China Coal Society,2015,40(7):1469-1476.
|
[10] |
张延明. 综采工作面回撤通道支护技术实践[J]. 煤矿安全,2010,41(11):44-45.
ZHANG Yanming. The practice of working face withdraw channel support technology[J]. Safety in Coal Mines,2010,41(11):44-45.
|
[11] |
朱家胜. 综采工作面末采期间回撤通道矿压显现规律及岩层控制研究[J]. 山西煤炭,2011,31(9):27-28.
ZHU Jiasheng. Strata behavior and control of retreating channels in fully-mechanized working face during the last mining phase[J]. Shanxi Coal,2011,31(9):27-28.
|
[12] |
侯殿坤,訾凤兵,卜庆为. 李家塔煤矿综采308工作面回撤通道支护技术研究[J]. 煤炭与化工,2018,41(1):5-9.
HOU Diankun,ZI Fengbing,BU Qingwei. Study on withdrawing roadway support technology of 308 fully mechanized working face of Lijiata mine[J]. Coal and Chemical Industry,2018,41(1):5-9.
|
[13] |
杨建海. 综采工作面回撤通道支护技术研究[J]. 当代化工研究,2020(1):52-53.
YANG Jianhai. Research on support technology of withdrawal passage in fully mechanized mining face[J]. Modern Chemical Research,2020(1):52-53.
|
[14] |
王进尚,柴磊,邓澄,等. 综采工作面大断面回撤通道注锚协同支护技术研究[J]. 煤炭技术,2019,38(7):33-36.
WANG Jinshang,CHAI Lei,DENG Cheng,et al. Research on collaborative support technique with bolting and grouting for large section reversal passage in fully mechanized mining face[J]. Coal Technology,2019,38(7):33-36.
|
[15] |
刘昭. 锚梁支护在大断面回撤通道中的应用[J]. 陕西煤炭,2020,39(4):170-173.
LIU Zhao. Application of anchor beam support in large section retracement roadway[J]. Shaanxi Coal,2020,39(4):170-173.
|
[16] |
石涛. 回撤巷道四柱支撑掩护式液压支架的应用[J]. 煤矿机械,2020,41(5):146-148.
SHI Tao. Application of four-column support shielded hydraulic support for retracing roadway[J]. Coal Mine Machinery,2020,41(5):146-148.
|
[17] |
高伟. 综采工作面快速回撤临时支护装备及技术分析[J]. 机械管理开发,2020,35(4):137-139.
GAO Wei. Technical analysis of temporary support equipment for rapid retreat in fully mechanized mining face[J]. Mechanical Management and Development,2020,35(4):137-139.
|
[18] |
王淑雷. 综采工作面回撤通道围岩控制技术应用[J]. 山东煤炭科技,2020(3):75-76.
WANG Shulei. Application of surrounding rock control technology in withdrawal channel of fully mechanized mining face[J]. Shandong Coal Science and Technology,2020(3):75-76.
|
[19] |
潘俊锋. 煤矿冲击地压启动理论及其成套技术体系研究[J]. 煤炭学报,2019,44(1):173-182.
PAN Junfeng. Theory of rockburst start-up and its complete technology system[J]. Journal of China Coal Society,2019,44(1):173-182.
|
[20] |
于斌,刘长友,刘锦荣. 大同矿区特厚煤层综放回采巷道强矿压显现机制及控制技术[J]. 岩石力学与工程学报,2014,33(9):1863-1872.
YU Bin,LIU Changyou,LIU Jinrong. Mechanism and control technology of pressure occurrence in roadway with extra thickness and mechanized caving coal seam in Datong mining area[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(9):1863-1872.
|