LIU Guiqin. Construction of PDM system of drilling rig based on Teamcenter[J]. COAL GEOLOGY & EXPLORATION, 2013, 41(4): 90-92. DOI: 10.3969/j.issn.1001-1986.2013.04.022
Citation: LIU Guiqin. Construction of PDM system of drilling rig based on Teamcenter[J]. COAL GEOLOGY & EXPLORATION, 2013, 41(4): 90-92. DOI: 10.3969/j.issn.1001-1986.2013.04.022

Construction of PDM system of drilling rig based on Teamcenter

  • According to the problems of product data management in the development process of drilling rig, PDM system is developed by Teamcenter, which involve project, archive, process, bill of material, component and CAD integration. It controls the technical data effectively in the development process of drilling rig, and provides a platform for digital development of drilling rigs.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return