牛建立. 地下水数值计算中断层处理的“切割—导通法”[J]. 煤田地质与勘探, 2002, 30(5): 39-40.
引用本文: 牛建立. 地下水数值计算中断层处理的“切割—导通法”[J]. 煤田地质与勘探, 2002, 30(5): 39-40.
NIU Jian-li. Using "Cut-Connect Method" to handle faults in groundwater numerical simulation[J]. COAL GEOLOGY & EXPLORATION, 2002, 30(5): 39-40.
Citation: NIU Jian-li. Using "Cut-Connect Method" to handle faults in groundwater numerical simulation[J]. COAL GEOLOGY & EXPLORATION, 2002, 30(5): 39-40.

地下水数值计算中断层处理的“切割—导通法”

Using "Cut-Connect Method" to handle faults in groundwater numerical simulation

  • 摘要: 从对断层导水性能的分析出发,提出了地下水数值计算中断层处理的“切割—导通法”,既考虑断层侧向导水性,又考虑了其垂向导水性,更符合断层导水的实际情况,也易于描述较大断裂在走向上的导水性差异。

     

    Abstract: Considering the vertical and horizontal conductive effect of faults,"Cut Connect Method" is proposed to tackle faults in groundwater numerical simulation.The method can treat conductive function of faults in both vertical and horizontal direction,and therefore depict better the conductivity of faults.

     

/

返回文章
返回