张雁, 田增林, 曹海东, 党亚堃, 王海, 李和平, 韩强. MJS工法在砾石层中的应用及成桩差异性[J]. 煤田地质与勘探, 2020, 48(2): 147-151,160. DOI: 10.3969/j.issn.1001-1986.2020.02.023
引用本文: 张雁, 田增林, 曹海东, 党亚堃, 王海, 李和平, 韩强. MJS工法在砾石层中的应用及成桩差异性[J]. 煤田地质与勘探, 2020, 48(2): 147-151,160. DOI: 10.3969/j.issn.1001-1986.2020.02.023
ZHANG Yan, TIAN Zenglin, CAO Haidong, DANG Yakun, WANG Hai, LI Heping, HAN Qiang. Application of MJS construction method in gravel layer and pile forming difference[J]. COAL GEOLOGY & EXPLORATION, 2020, 48(2): 147-151,160. DOI: 10.3969/j.issn.1001-1986.2020.02.023
Citation: ZHANG Yan, TIAN Zenglin, CAO Haidong, DANG Yakun, WANG Hai, LI Heping, HAN Qiang. Application of MJS construction method in gravel layer and pile forming difference[J]. COAL GEOLOGY & EXPLORATION, 2020, 48(2): 147-151,160. DOI: 10.3969/j.issn.1001-1986.2020.02.023

MJS工法在砾石层中的应用及成桩差异性

Application of MJS construction method in gravel layer and pile forming difference

  • 摘要: 在我国某露天煤矿截水帷幕建造过程中,由于受架空高压线、地埋光缆、地埋排水管等多处障碍物影响,局部区域直接成槽工艺无法施工,因此,选择可以"全方位"施工的MJS工法完成此类区段建造。MJS试桩结果表明,该工法在东西两侧卵砾石层施工区成桩质量差异明显,为查明成桩差异性原因,采用地质勘探、重力触探试验和抽水试验等方法,从砾石层厚度、砾径、含砂量、地层密实度和含水层渗透能力等方面进行分析。结果表明,在砾石层厚度大、含砂量小、地层密实、含水层渗透性强的施工东区无法成桩,而在条件相反的施工西区成桩质量符合要求。研究成果拓宽了MJS工法的应用范围,对类似条件下MJS工法施工参数的选择具有指导意义。

     

    Abstract: During the construction of water cutoff curtain in an open-pit coal mine in China, parts of the grouting groove couldnot be constructed due to many obstacles such as overhead high-voltage wire, buried optical cable and buried drainage pipe, and MJS construction method was chosen instead to build the cutoff curtain. The results of MJS pile tests show that the quality of piles formed by this method was obviously different in the construction area of gravel layer on the east and west sides. By the methods of geological exploration, gravity penetration test and pumping test, this paper makes a comparative analysis of gravel thickness, gravel diameter, sand content, formation compactness and permeability of aquifer. The results show that the pile can not be formed in the east construction area with thick gravel layer, small sand content, dense stratum and strong permeability, while the pile forming quality met the requirements in the west construction area where the conditions were opposite. The research results broaden the application scope of MJS construction method and have guiding significance for the selection of construction parameters under similar conditions.

     

/