杨光辉, 李武强. 施工及地质条件对桩基低应变动力反射波曲线的影响[J]. 煤田地质与勘探, 2003, 31(2): 37-39.
引用本文: 杨光辉, 李武强. 施工及地质条件对桩基低应变动力反射波曲线的影响[J]. 煤田地质与勘探, 2003, 31(2): 37-39.
YANG Guang-hui, LI Wu-qiang. Influence of construction and geology conditions on the reflected waves[J]. COAL GEOLOGY & EXPLORATION, 2003, 31(2): 37-39.
Citation: YANG Guang-hui, LI Wu-qiang. Influence of construction and geology conditions on the reflected waves[J]. COAL GEOLOGY & EXPLORATION, 2003, 31(2): 37-39.

施工及地质条件对桩基低应变动力反射波曲线的影响

Influence of construction and geology conditions on the reflected waves

  • 摘要: 桩基低应变动力反射波法检测,以其特有的优势在工程中得以广泛应用。本文阐述了施工工艺及地质条件对测试曲线的影响,提出了反射波曲线综合分析的途径与方法。

     

    Abstract: The measuring of dynamic reflected waves for low strain of pile base has been applied. This paper discusses the influence of construction and geology condition on the reflected waves,and put forwards the synthetic analysis method of reflected wave curves.

     

/

返回文章
返回