DRILLING TECHNIQUES OF LARGE DIAMETER HOLES FOR THE FOUNDATION PILES OF QOM BRIDGE IN IRAN
-
摘要: 介绍了在伊朗库姆大桥工地利用泵吸反循环冲洗一次成孔工艺,施工大口径基桩孔的技术问题,包括埋设护筒、移机定位、对鱼尾导向和燕尾导向刮刀钻头镶焊角度的改进和变换泵轴密封材料等,提高了成孔效率和质量。Abstract: The author introduced a successful experience of reverse circulation drilling with pumping in Iran. The technical problems in construction of large diameter holes were solved,including the covering of muff,shifting and positioning of the drilling rig,improving of the welding angles of the fishtailed and swallowtailed drag bits and the exchange of sealing materials of pumps etc. The construction of the foundation piles of Qom Bridge reached a good result with high efficiency and fine quality.
-
Keywords:
- big hloe /
- reverse circulation drilling /
- drilling rate
-
计量
- 文章访问数: 48
- HTML全文浏览量: 9
- PDF下载量: 2