曹丁涛. 利用预测型线性规划评价矿区地下水开采量[J]. 煤田地质与勘探, 1993, 21(6): 38-41.
引用本文: 曹丁涛. 利用预测型线性规划评价矿区地下水开采量[J]. 煤田地质与勘探, 1993, 21(6): 38-41.
Cao Dingtao. APPRAISAL ON EXTRACTION OUTPUT OF THE GROUND WATER IN A CERTAIN COAL MINING AREA BY APPLICATION OF THE PREDICTED LINEAR PROGRAMMING[J]. COAL GEOLOGY & EXPLORATION, 1993, 21(6): 38-41.
Citation: Cao Dingtao. APPRAISAL ON EXTRACTION OUTPUT OF THE GROUND WATER IN A CERTAIN COAL MINING AREA BY APPLICATION OF THE PREDICTED LINEAR PROGRAMMING[J]. COAL GEOLOGY & EXPLORATION, 1993, 21(6): 38-41.

利用预测型线性规划评价矿区地下水开采量

APPRAISAL ON EXTRACTION OUTPUT OF THE GROUND WATER IN A CERTAIN COAL MINING AREA BY APPLICATION OF THE PREDICTED LINEAR PROGRAMMING

  • 摘要: 建立了某矿区水源地当前和未来不同时期地下水开采量评价的预测型线性规划模型,得到了不同时期的最大开采量及相应的最优运行方案,为矿区发展规划提供了决策依据。

     

    Abstract: A predicted linear programming model is set up for the appraisal on extraction output of the ground water in the water-source zone of a certain coal mining area,both for the present and the different stages in future.The maximum extractions in different stages can be derived from this model and an optimal programme can be prepared accordingly to form the basis for decision-making in the development of the coal mining district.

     

/

返回文章
返回