华蓥山公路隧道地质病害防治措施
Control of geological disaster in Huayingshan highway tunnel
-
摘要: 四川华蓥山隧道为全国在建之最长、地质条件最复杂的公路隧道。本文介绍了工程中采用的瓦斯突出、岩溶水突出、油气燃烧及地下水腐蚀的防治技术。Abstract: The Huayingshan highway tunnel is the longest and most complicated geological conditions in China.This paper introduces control technologies for gas blower, Karat water gushing,oil and gas burn and corroding of groundwater.