刘其声, 蔡东红, 彭龙超. 刘桥一矿II622工作面充水条件与防治水技术探讨[J]. 煤田地质与勘探, 2002, 30(6): 44-47.
引用本文: 刘其声, 蔡东红, 彭龙超. 刘桥一矿II622工作面充水条件与防治水技术探讨[J]. 煤田地质与勘探, 2002, 30(6): 44-47.
LIU Qi-sheng, CAI Dong-hong, PENG Long-chao. Discussion on water inrush conditions and groundwater hazards preventing problem for work face II622 at No.1 Liuqiao Coal Mine[J]. COAL GEOLOGY & EXPLORATION, 2002, 30(6): 44-47.
Citation: LIU Qi-sheng, CAI Dong-hong, PENG Long-chao. Discussion on water inrush conditions and groundwater hazards preventing problem for work face II622 at No.1 Liuqiao Coal Mine[J]. COAL GEOLOGY & EXPLORATION, 2002, 30(6): 44-47.

刘桥一矿II622工作面充水条件与防治水技术探讨

Discussion on water inrush conditions and groundwater hazards preventing problem for work face II622 at No.1 Liuqiao Coal Mine

  • 摘要: 结合刘桥一矿二水平II623和II626工作面突水资料,对即将回采的II622工作面矿床水文地质条件和突水因素进行了分析。在此基础上,分析了该工作面回采过程中的突水机理和突水模式,提出了工作面在回采过程中应采取的防治水安全技术保障措施。

     

    Abstract: Based on water inrush formations of work faces II623 and II626, the mine hydrogeological conditions and water inrush factors of work face II622 at No.1 Liuqiao Coal Mine have been discussed.Water inrush mechanism and pattern in mining process have been analysed.At last, groundwater hazards preventing safety measures have been put forward for work face II622.

     

/

返回文章
返回