摘要: 导水陷落柱导致的底板奥灰突水是同煤集团塔山矿的主要水害威胁,矿井8228工作面巷道掘进过程中曾发生陷落柱突水。为查明此导水陷落柱发育边界及其内部充填破碎体分布特征,并对陷落柱进行针对性注浆治理,在井上下综合物探勘探的基础上,采用分层多分支地面定向水平钻钻速录井、钻井液漏失量、岩屑录井、随钻测井等综合探查技术手段,结合数据统计分析,查明导水陷落柱的发育边界、影响带范围和破碎体胶结情况及其分布特征。结果表明,导水陷落柱的长短轴分别为410、200 m,破碎区主要分布在靠近工作面突水巷道运输巷掘进工作面右前方。利用Surpac软件对陷落柱空间结构和发育特征进行三维地质建模,并根据柱体充填物破碎程度将其刻画分区为主通道区、裂隙区和次生裂隙区。针对陷落柱破碎体不同分区,利用定向水平钻进控制技术和阻水塞立体建造注浆工艺分区控制技术,通过充填、挤密、劈裂等不同注浆工艺,对工作面导水陷落柱进行截源、加固等综合治理,最终实现工作面安全回采。定向水平钻分层多分支陷落柱综合探查与治理技术为其他类似工程提供重要的借鉴意义。Abstract: The Ordovician limestone water inrush from floor caused by water-conducted collapse columns is the main water hazard threat in Tashan Mine of Tongmei Group. Water inrush from collapse columns once happened in the roadway excavation of 8228 working face. On the basis of comprehensive geophysical exploration above and below the well, the development boundary, the influence zone, the cementation of the fractured body and the distribution characteristics of the water flowing subsided column are found out by means of multi-layer and multi-branch surface directional horizontal drilling speed logging, drilling fluid leakage, cuttings logging and logging while drilling, and combined with data statistical analysis, so as to find out the development boundary of the water flowing subsided column and the distribution characteristics of the broken body filled in it, and to control the subsided column by Grouting. The results show that the length and short axis of the collapse column is 410 m, 200 m, and the broken area is mainly distributed in the right front of the driving head of the belt roadway near the water inrush roadway. The 3D geological modeling of the spatial structure and development characteristics of the collapse column is carried out by using Surpac software, and the main passageway area, fracture area and secondary fracture area are divided according to the crushing degree of the collapse column filling material. In view of the different zones of the collapse column broken body, the directional horizontal drilling control technology and separate zones of the grouting technology are used to construct the three-dimensional water-blocking plug. The safe mining of the working face is finally realized by the comprehensive treatment of cutting the source and reinforcing the water-flowing collapse column. The comprehensive exploration and treatment technology of directional horizontal drilling multi-branch collapse column provides a good reference for other similar projects.
-
-
[1] 南生辉,蒋勤明,郭晓山,等. 导水岩溶陷落柱堵水塞建造技术[J]. 煤田地质与勘探,2008,36(4):29-33. NAN Shenghui,JIANG Qinming,GUO Xiaoshan,et al. Construction technique of groundwater-preventing piston in Karst flow collapse column[J]. Coal Geology & Exploration,2008,36(4):29-33.
[2] 尹尚先,武强,王尚旭. 北方岩溶陷落柱的充水特征及水文地质模型[J]. 岩石力学与工程学报,2005,24(1):77-82. YIN Shangxian,WU Qiang,WANG Shangxu. Water-bearing characteristics and hydro-geological models of Karstic collapse columns in North China[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(1):77-82.
[3] 钟亚平. 开滦煤矿防治水综合技术研究[M]. 北京:煤炭工业出版社,2001. ZHONG Yaping. Studies on integrate technology of water prevention in Kailuan Mines[M]. Beijing:China Coal Industry Publishing House,2001.
[4] 武强. 我国矿井水防控与资源化利用的研究进展、问题和展望[J]. 煤炭学报,2014,39(5):795-805. WU Qiang. Progress problems and prospects of prevention and control technology of mine water and reutilization in China[J]. Journal of China Coal Society,2014,39(5):795-805.
[5] 杜兵建. 峰峰矿区九龙矿隐伏突水陷落柱治理实践[J]. 中国煤炭地质,2012,24(3):31-35. DU Bingjian. Fathering practice of hidden water inrush subsided column in Jiulong coalmine,Fengfeng mining area[J]. Coal Geology of China,2012,24(3):31-35.
[6] 史先志,袁德铸,葛均刚. 陈四楼煤矿21301工作面陷落柱防治水技术研究[J]. 中国煤炭,2009,35(4):104-105. SHI Xianzhi,YUAN Dezhu,GE Jungang. On the prevention and control of mine water induced by collapse column in #21301 coal face in Chensilou coal mine[J]. China Coal,2009,35(4):104-105.
[7] 王则才,武强. 岩溶陷落柱与矿井防治水策略研究[J]. 工程勘察,2002(1):29-30. WANG Zecai,WU Qiang. On karst collapse column and tactics of mine water prevention[J]. Geotechnical Investigation & Surveying,2002(1):29-30.
[8] 赵苏启,武强,郭启文,等. 导水陷落柱突水淹井的综合治理技术[J]. 中国煤炭,2004,30(7):25-27. ZHAO Suqi,WU Qiang,GUO Qiwen,et al. Comprehensive control technologies of water bursting from water conducted collapsing pole[J]. China Coal,2004,30(7):25-27.
[9] 孟召平,易武,兰华,等. 开滦范各庄井田突水特征及煤层底板突水地质条件分析[J].岩石力学与工程学报,2009,28(2):228-237. MENG Zhaoping,YI Wu,LAN Hua,et al. Water inrush characteristics of Fangezhuang coalmine field in Kailuan and its geological condition analysis of water inrush from coal seam floor[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(2):228-237.
[10] 郑士田,马培智. 陷落柱中"止水塞"的快速建立技术[J]. 煤田地质与勘探,1998,26(3):51-53. ZHENG Shitian,MA Peizhi. The technique building "Concrete Plug" quickly in collapse column[J]. Coal Geology & Exploration,1998,26(3):51-53.
[11] 尹尚先,连会青,刘德民,等. 华北型煤田岩溶陷落柱研究70年:成因·机理·防治[J]. 煤炭科学技术,2019,47(11):1-29. YIN Shangxian,LIAN Huiqing,LIU Demin,et al. 70 years of investigation on Karst collapse column in North China coalfield:Cause of origin,mechanism and prevention[J]. Coal Science and Technology,2019,47(11):1-29.
[12] 赵庆彪,程建远,杜丙申,等. 东庞矿突水陷落柱综合探查技术[J]. 煤炭科学技术,2008,36(8):96-100. ZHAO Qingbiao,CHENG Jianyuan,DU Bingshen,et al. Comprehensive survey technology of water inrush sink hole in Dongpan mine[J]. Coal Science and Technology,2008,36(8):96-100.
[13] 勾永全. 石炭二叠系特厚煤层奥灰水害地面区域探测及治理技术研究[J]. 同煤科技,2018(3):8-10. GOU Yongquan. Research on ground detection and treatment technology of Ordovician limestone water damage in extra-thick coal seam of Carboniferous[J]. Tong Mei Ke Ji,2018(3):8-10.
[14] 徐晓宏. 井上下协同探测奥灰水治理技术研究[J]. 煤炭技术,2019,38(10):115-117. XU Xiaohong. Study on technology of coal mine synergistic detection of Ordovician limestone water[J]. Coal Technology,2019,38(10):115-117.
[15] 姚宁平. 我国煤矿井下近水平定向钻进技术的发展[J]. 煤田地质与勘探,2008,36(4):78-80. YAO Ningping. Development trend of nearly horizontal directional drilling technology in coal mines of China[J]. Coal Geology & Exploration,2008,36(4):78-80.
[16] 郑士田. 地面定向钻进技术在煤矿陷落柱突水防治中的应用[J]. 煤炭科学技术,2018,46(7):229-233. ZHENG Shitian. Application of ground directional borehole technology to control prevention karst collapsed column water inrush in coal mines[J]. Coal Science and Technology,2018,46(7):229-233.
[17] 王佑宁,惠卓雄,刘志刚,等. PDC钻头条件下岩性识别新技术探讨[J]. 录井技术,2003,14(4):1-7. WANG Youning,HUI Zhuoxiong,LIU Zhigang,et al. The discussion on the lithology identification technique with the PDC bit[J]. Mud Logging Technique,2003,14(4):1-7.
[18] 王俊峰. 录井现场岩性识别技术现状及发展趋势探讨[J]. 信息系统工程,2019(4):101. WANG Junfeng. Current situation and development trend of lithologic identification technology in mud logging site[J]. China CIO News,2019(4):101.
[19] 田小超,蒋必辞,汲方林,等. 随钻伽马测井系统在顺煤层钻进中的应用[J]. 煤矿安全,2020,51(2):135-138. TIAN Xiaochao,JIANG Bici,JI Fanglin,et al. Application of Gamma logging while drilling system in drilling along coal seam[J]. Safety in Coal Mines,2020,51(2):135-138.
[20] 夏宏泉,陈平,石晓兵,等. 基于随钻资料的地层岩性实时识别方法[J]. 石油学报,2004,25(2):51-54. XIA Hongquan,CHEN Ping,SHI Xiaobing,et al. Real-time recognizing method of lithology based on information while drilling[J]. Acta Petrolei Sinica,2004,25(2):51-54.
计量
- 文章访问数: 122